4108 Mesa lane project is just about ready to start winding down.

Our potential timeline is as follows:

Between today 2/11/2018 and tomorrow (Monday) we should be about wrapped up inside with the exception of the counter tops.  Those are due in on Wednesday, 2/14/2018 (Happy Valentines Day!)

Tuesday 2/13/2018 & Wednesday 2/14/2018, paint the outside (weather dependent) and roof goes on.

Unless, we get held up by weather or something, we should be ready for market by this time next week!

Details:

3 Bed, 1 1/2 bath

All new flooring

All new paint

All new electrical outlets (with usb charging in Living room and bedrooms)

All new kitchen cabinets

All new kitchen counters

All new kitchen appliances

All new lighting

All new bathroom fixtures (tub, toilet, sink, vanity, new ceramic flooring, paint, fan, shower tile)

All new interior doors (bedrooms and closet)

All new flooring in ‘family space’ on bottom floor with newly designed Ceramic top bar area

All new painted fireplace

All new Ceramic tile on fireplace

All new garage doors

All new paint in garage (floor and walls)

….and more, too much to list!

Some pics to wet your appetite!

 

 

 

 

 

Leave a Reply

Your email address will not be published. Required fields are marked *

Top
LinkedIn Auto Publish Powered By : XYZScripts.com
0 Flares Facebook 0 Google+ 0 LinkedIn 0 Twitter 0 Pin It Share 0 0 Flares ×